Project Experience

  • CDCR Richard J Donovan Infill

    Otay Mesa | California The RJ Donovan Infill project includes the construction of a new 298,098 square-foot housing facilities. This facility includes nine new buildings and the renovation of the existing kitchen, warehouse and receiving and release buildings. The $169 million project will include 3 level II 264 bed housing units. In addition to these housing units, the […]

  • California Department of General Services – San Quentin Seismic Rehabilitation

    San Quentin | California Principal Mark Moore served as Project Manager on this project prior to joining ZFA. As part of the State Building Seismic Retrofit Program, a seismic evaluation and retrofit of the prison’s Food Service and Kitchen Buildings was performed. Challenges involved construction access and safety in this fully-operational, high-security facility. The project […]

  • Adelanto Detention Facility West

    Adelanto | California The Adelanto Correctional Facility project was completed in 2012. ZFA prepared the structural design calculations and fabrication drawings for 96 precast concrete prison modules encompassing a total of 176 prison cells, showers, storage rooms, and medical exam rooms. The design and detailing included completely fabricated, ready-to-use modules. The modules were cast locally with […]

  • CCA San Diego – Prison Healthcare Facility

    San Diego | California The project consists of monolithically cast cell blocks that are joined to form two-story units: there are approximately 36 to 38 module types. The units are designed to be stand alone and self-supporting structures. The housing areas are separated by a strategically located seismic joint from the administration building, which affords […]