Aragon High School CTE Building

San Ramon | California

AragonHS_DSCF0131OverallExt

Photo courtesy of QKA

This new two-story classroom building includes several of the school’s most popular programs such as biotech labs, a robotics shop, and a media arts classroom. The new building extends north of the existing science wing, and it includes a new exterior covered walkway and stair. The design includes steel concentric braced frames in chevron and x configurations to accommodate the varied shop classroom shapes and desired windows and balconies.  Construction Cost: $5.1M | Completed: 2012

AragonHS_DSCF0200RoboticeInt

Photo courtesy of QKA