Kaiser Permanente Medical Center Facility Upgrades

Santa Rosa | California

kaiser_med_center_upgrades_0

As part of the in-service facility upgrade, ZFA provided the structural engineering for the replacement of essential equipment (Pyxis, Blood Refrigeration, etc.) required in the pharmacy and other areas of the facility. Construction was completed in 2009.

ZFA has provided additional structural engineering for the following projects at Kaiser Permanente Medical Center:

  • Air Handler
  • E.D. Safe Room
  • Linen Car Wash #A31
  • Extra Services Ultra Sonic Washer
  • 4 East Nurses Station Remodel
  • MOB West/GI
  • L & D Renovations
  • Medical Imaging Remodel #284
  • MOB 2 Suite 130 Nurses Station Remodel
  • Mechanical Duct Enclosure
  • Special Procedure Room
  • Sterilization Equipment
  • Satellite Blood Draw
  • Cafeteria Renovation

Categories