Yuba Community College – Clear Lake Campus

Clear Lake | California

This new campus includes a structural steel, two-story, 15,000 SF administration building with braced frames. An elaborate, “floating,” entry stair reaches up to the new campus library; a new 5,000 sf single-story laboratory and a 5,000 sf multi-purpose building. Geopier foundations were used to effectively mitigate less-than-ideal subgrade conditions and push an aggressive schedule that included a two-increment submittal to DSA. This project reflects the success of the new DSA Collaborative Design process.
Construction Cost $12M | Completed: 2011