Napa Fire Station No. 5

Category: Work
Napa, CA

This project consists of a new 5,145 square foot fire station with two drive-through bays for 2 engines. The design was to be cost effective wood construction including the 18’ tall apparatus bays. The design has been coordinated to eliminate structural steel moment frames at the front and rear of the apparatus bay. Also included are a single trash enclosure, backup generator pad, sound walls and patio, and a small 250 square foot storage building.

Photo Credit: Abraham & Paulin Photography

Size 5,145 sf
Completed 2018
Construction Cost $4.8M
Architect Shah Kawasaki Architects
Contractor Diede Construction
Owner City of Napa